TECHNICAL SPECIFICATIONS

  • Dosing unit 8 m³
  • Digester 1.206 m³
  • Digestion residue storage 4.800 m³
  • CHP 99 kW
  • Gas flare 40 m³/h
  • Pump station
  • Tech container

PLANT PERFORMANCE

  • Plant output
    99 kW
  • Biogas production
    50 Nm³
  • Biogas production / year
    416.100 Nm³
  • CO2 savings / year
    483 t

SUBSTRATES

  • Cattle manure
  • Cattle slurry

PROJECT INFORMATIONS

  • Year of construction 2021
  • Operator Familie Fiedler

More pictures: