Technical specifications

  • Dosing unit 100 m³
  • Mixing tank 1 50 m³
  • Mixing tank 2 50 m³
  • Mixing pump
  • Grinder
  • Digester 1 2.488 m³
  • Digester 2 2.488 m³
  • Digestion residue storage 5.445 m³
  • Pump station
  • Tech building
  • Separator

Plant performance

  • Biomethane production
    180 Nm³
  • Biogas production
    358 Nm³
  • Biogas produkction / year
    2.977.600 Nm³
  • CO2 savings / year
    4.318 t

Substrates

  • Grain straw
  • Grain waste
  • Rye silage
  • Poultry manure
  • Beet pulp
  • Industrial water

Project informations

  • Year of construction
    2022
  • Operator
    SAS Gentillerie Méthanisation